The SPANC report is the official inspection of a house's private drainage system. If it says non-compliant, the buyer must bring the system into line within one year of completion, and a replacement on a rural site commonly costs EUR 9,000 to EUR 15,000. Ask for the report before you offer, not after.
What the report is
SPANC is the public body that inspects private sewage installations (assainissement non collectif). For any sale of a house not connected to mains drainage, the seller must supply a SPANC report less than three years old. It grades the installation and names the faults.
What non-compliant means for the buyer
Under article L.1331-11-1 of the code de la santé publique, the buyer of a non-compliant installation must carry out the works within a year of the sale. It is a committed cost with a deadline, not an improvement you can defer.
The size of that cost depends on the grade:
- A missing or non-compliant outlet, an undersized filter bed or an inaccessible inspection hatch: the cheaper end, and the system usually goes on working meanwhile.
- No treatment stage, or a direct discharge to a ditch or stream: a complete new installation, with a soil study and design, at the top of the range or beyond it where the ground drains badly.
Why get it early
It is the seller's obligation, it already has to exist for the sale, and it is a document rather than an opinion. Asking costs nothing and turns an unpriced risk into a number you can put in the offer. Adverts that say "fosse non conforme" have disclosed the fact but not the grade. The grade is the difference between a EUR 9,000 job and a EUR 15,000 one.
On the visit
- Find the tank and the outlet. Ask when it was last emptied.
- Ask directly what the SPANC report says is wrong.
- Look at where a new filter bed could go: the ground, the slope, the distance to any well or watercourse.
A report from us states whether the advert declares the drainage, what the law requires, and the cost band for the type of site. The SPANC report itself is what turns that band into a figure for the house.
Every pre-offer check covers this for the specific address, with the source and the date it was read. Check a property, or read the full sample report.